400-ton chemical factory goes to Huntsman by water
A 400-ton part of a polyol factory was transported by pontoon from the province of Brabant to the port of Rotterdam. Client
Huntsman Holland is modernising the existing plant in Rozenburg. The aim is to increase the polyol production capacity
through new technology and faster completion times to 30,000 tons per year.
Source:Miscellaneous
DATE:2014.2.24
400吨化学工厂水运至Huntsman
一个400吨的多元醇工厂由浮桥从布拉班特省水运运往至鹿特丹港。Huntsman的客户在荷兰对现有工厂进行了现代化管理。其目的是通过新的技术提高多元醇的生产能力,以更快的时间达到3万吨/年。
来源:Miscellaneous
日期:2014年2月24日